Carlsson, Mats and Kreuger, Per and Åström, Emil (1999) Constraint-based resource allocation and scheduling in steel manufacturing. In: PADL'99: First International Workshop on Practical Aspects of Declarative Languages, 18-19 Jan 1999, San Antonio, Texas, USA.
| PDF 1893Kb | |
| Postscript 4Mb |
Official URL: doi: 10.1007/3-540-49201-1
Abstract
This paper describes a flow maximization problem in steel manufacturing, decomposes it into three sub-problems, and models them in terms of finite domain constraints. Greedy algorithms are used for solving the sub-problems. The constraints are used for maintaining consistency rules, not for optimization. A tool implementing these algorithms and equipped with a GUI has been implemented.
| Item Type: | Conference or Workshop Item (Paper) |
|---|---|
| Additional Information: | Edited by G. Gupta. Pages 335-349. Lecture notes in computer science; 1551. Springer-Verlag. ISBN 3-540-65527-1 |
| Uncontrolled Keywords: | flow maximization - scheduling - finite domain constraints - steel manufacturing |
| ID Code: | 3203 |
| Deposited By: | Dominique Johansson |
| Deposited On: | 05 Aug 2008 |
| Last Modified: | 18 Nov 2009 16:19 |
Repository Staff Only: item control page

